Bethann & Leo Horey

Sample Ravel Page

Ravel Overview

The inspected and modeled areas of the home and surrounding landscape are extremely well maintained. Minor issues related to excess moisture and ventilation were noted and will be monitored.

Several preventative measures should be taken to ensure the continued well being of the home.

Home Statistics

Year Built

1914

Sq. Footage

~5,100

Bedrooms

4

Bathrooms

3.5

Report Summary

The ‘Quick Hits’ section below identifies the areas of your home that are doing well and those that might need more attention. The more stars the better!

To download the detailed report, click on the PDF download icon below.

Click PDF Icon Above to Download Inspection Report

'Quick Hit' Categories

Roof

3.5/5

Exterior

4/5

Heating

5/5

Cooling

2.5/5

Plumbing

4.5/5

Electrical

5/5

Ventilation

3.5/5

Openings

3.5/5

Other

5/5

Home service documentation

7/25/2019

Overview of service visit

A home service visit was conducted on 7/25/2019. All aspects of the home appeared to be in normal working condition. Various a la carte items were completed.

Completed items

The roof was cleared and excess water blown off. Vegetation was removed from the side of the house. The driveway drain was cleared. Old drip pans were removed and new drip tray added under the refrigerator.

pending repair items

Estimates for raising the driveway are pending.

Consultation with Marc DiRienzo for attic insulation is scheduled for 7/30/2019.

Estimates for removing overhanging limbs are pending.

Landscape light bulb in back yard out.

Remaining a la carte items will be completed within the week (8/1/2019).

Items for future consideration

The upstairs air conditioning unit appears to be functioning, but will continued to be monitored.

The west sleeping porch does not have siding. It appears that it was removed during roof repair and never replaced. Consider replacing cedar siding to help prevent moisture intrusion.

One chimney cap is either missing or was never in place. Consider adding a chimney cap to prevent animal infestation.


Service Visit Photo Highlights

Roof Clearing
All areas of the roof were inspected and cleared. Next clearing will be completed in the fall or as needed.
Driveway Drain Cleared
Driveway drain was cleared. Estimates to raise driveway will be compiled and presented.
Initial Bulk Removal of Vine
Remaining vegetation was removed from the side of the house. Detailed cleaning is pending.
Previous
Next

Service Visit Detailed photos

Questions? Contact Us!